CIVIL WORK
1 / 36
1. What is the name of item number (1)?
2 / 36
2. Which part helps the scaffold stand on the ground? (Number 2)
3 / 36
3. What is number (4) used for? it is internal ladder
4 / 36
4. What is number (5) called Gate?
5 / 36
5. Which part protects workers from falling at the top (number 7)?
6 / 36
6. What is the name of part number (9)?
7 / 36
7. What is number (3) used for? it is board
8 / 36
8. Which part connects scaffold tubes together? (Number 12)
9 / 36
9. What is the name of the cross support (X shape) on the side (number 10)?
10 / 36
10. What is the name of the tall frame on the side? (Number 11) Vertical frame
11 / 36
it is lifting operation ?
12 / 36
it is manual offloading of scaffolding materials?
13 / 36
is this work?
14 / 36
what is the work ?
15 / 36
it is ensuring fall protection is anchored securely .
16 / 36
we use this for ?
17 / 36
describe this work ?
18 / 36
19 / 36
he modifying the scaffold ?
20 / 36
Name only five of the scale that represent probability ?
21 / 36
Which category does this belong to?
22 / 36
1.** What is number 1 in the picture?
23 / 36
2.** Which tool is used for digging in the soil?
24 / 36
3.** What is number 13 ?
25 / 36
4.** Which item is soft and used for heat protection?
26 / 36
5.** What is number 11? (rebar)
27 / 36
7.** What is number 14 ?
28 / 36
6.** Which tool is number 3?
29 / 36
8.** Which item is number 16? (door)
30 / 36
9.** What is number 17?( wood beam)
31 / 36
10.** Which item is number 7?
32 / 36
? what is this it is dumptruck
33 / 36
?the is shovel
34 / 36
35 / 36
it is grader ?
36 / 36
it is hiab ?
Your score is
The average score is 0%
Restart quiz
لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *
التعليق *
الاسم *
البريد الإلكتروني *
الموقع الإلكتروني
احفظ اسمي، بريدي الإلكتروني، والموقع الإلكتروني في هذا المتصفح لاستخدامها المرة المقبلة في تعليقي.
اترك تعليقاً