OIL DRILLING RIGS QUIZ

OLI DRILLING RIQS

1 / 25

1. Who is responsible for operating the drilling controls?  

2 / 25

2. Who studies rock samples to find oil and gas? 

3 / 25

3. Who is responsible for safety, health, and environmental procedures? 

4 / 25

4. Who manages materials and supplies in the warehouse? 

5 / 25

5. Who works on the drilling floor handling pipes and equipment?  it is floor Man.

6 / 25

1. Which part is located at the very top of the derrick and contains several pulleys(1)? 

7 / 25

2. Which part moves up and down inside the derrick to lift the drill string(4)? 

8 / 25

3. Which component rotates the drill string from the top(5)? 

9 / 25

4. Which equipment is installed below the rig floor to control well pressure (8)? 

10 / 25

5. Which structure is used to move drill pipes from the ground to the rig floor(pipe ramp 7) ? 

11 / 25

1. Which equipment removes large rock cuttings from the drilling mud? 

12 / 25

2. Which machine circulates drilling mud under high pressure? 

13 / 25

3. Which equipment separates gas from the drilling mud? 

14 / 25

4. Which hose carries drilling mud from the pump to the drilling system? 

15 / 25

5. Which tanks are used to store and mix drilling mud?

16 / 25

1. **What is number 1 in the picture?**

17 / 25

2. **Which number shows the production tubing?**

18 / 25

3. **Where is the cement sheath?**

19 / 25

4. **What is number 5 called?** it is pipe tube

20 / 25


5. **Which part is the christmas tree?**

21 / 25

6. **What is the function of the pressure gauge (number 10)? it is measures pressure

22 / 25

7. **Where is the oil flowline in the picture?**

23 / 25

8. **Which part is underground: wellhead or wellhead cellar?** it is casing

24 / 25

9. **Is the perforation (inside  or below) the reservoir rock?** it is inside

25 / 25

10. **What does number 7 represent?** wellhead

Your score is

The average score is 0%

0%

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *